Wireless Network
Provenance: this engagement was delivered under PM2net, prior to the founding of Megsolve. It was led by Esram Gibran Khan, now Managing Partner at Megsolve, and is presented here as documented delivery experience rather than as a Megsolve client engagement.
5Access points deployed
3Switches installed
4Cable drops
The opportunity
01 · CONTEXT
Morley Builders has provided construction services across Southern California since 1947, with over 175 professionals and 300 skilled tradespeople across offices in Santa Monica, Irvine, and San Diego.
Three locations carried limited and inconsistent Wi-Fi coverage: Radian Apartments in San Diego, Thatcher Yard in Los Angeles, and 200 Mesnager Street Apartments in Long Beach. The result was connectivity failures, dead zones, and slow performance that undermined productivity, communication, and user experience daily.
The existing infrastructure could not meet demand and needed replacing rather than patching.
The solution
02 · DELIVERY
Meraki MR45 access points and Meraki Go switches, placed against site-specific wireless surveys rather than floor plans alone.
PH 01
Survey and design
Wireless surveys conducted using Ekahau to map real coverage and interference
Site-specific configurations designed around building layout and user density
Detailed deployment plan produced ahead of mobilisation
PH 02
Access point deployment
Five Meraki MR45 access points installed and configured across the three locations
Licensing activated to ensure full platform functionality
PH 03
Switching and cabling
Three Meraki Go switches installed at critical locations
Four cable drops implemented to establish a robust physical network foundation
PH 04
Testing and quality assurance
Rigorous testing performed to verify the new network configuration
Potential issues identified and resolved before handover
PH 05
Training and ongoing support
User training sessions delivered to employees, residents, and site users
Ongoing support established to address concerns and technical issues promptly
Continuous monitoring and maintenance implemented for sustained performance
The impact
03 · OUTCOME
Dead zones eliminated
Comprehensive, consistent coverage delivered across all three locations
Connectivity failures resolved at Radian Apartments, Thatcher Yard, and 200 Mesnager Street
Network performance optimised
Configurations tuned to building layout and user density per site
Reliable wireless connection established throughout each location
Productivity and satisfaction
Day-to-day operations improved through dependable connectivity
User satisfaction raised across employees and residents
Sustained operation
Continuous monitoring system implemented to catch emerging issues proactively
Training and support structures left in place after handover
Cisco Meraki MR45Meraki Go SwitchesEkahauWireless SurveyStructured Cabling
CLOSING NOTE
Wireless surveys before installation meant the access points went where the coverage gaps actually were, not where the floor plan suggested they might be.